top of page

Energy Centre

Cambridgeshire

Sector:

Energy

SERVICES:

Structural Engineering

Project Overview

The project involved the UK's first large scale, ground source heat pump, energy distribution centre, designed to supply energy to a local village.


Subteno’s scope included the structural design of the main process building, along with inspection services during both fabrication and construction installation.

bottom of page