top of page

Distribution Centre

Northamptonshire

Sector:

Commercial

SERVICES:

Civil Engineering

Project Overview

A thirty year old, eight hectare distribution site used by a retailer with site   wide drainage issues and non-compliant leaking oil interceptors.


Subteno supported the contractor with the design of a phased drainage replacement and a new interceptor that was 16m long x 4m diameter, installed 6m below ground level.

bottom of page